Hidroelectrica do Canedo
PROJECT DETAILS
| Project ID: [24875] | |
| Country: | Portugal |
| City: | Portugal |
| Year: | 2008 |
| Application: | Hydropower |
| Installation: | Open Trench |
| Technology: | Flowtite |
| Total Length: | 3500 m |
| Nominal Diameter DN: | 1600 | 1800 mm |
| Nominal Pressure PN: | 6 | 16 bar |
| Nominal Stiffness SN: | 5000 | 5000 N/m2 |
| Contractor: | CONSTRUÇOES GABRIEL A.S. COUTO S.A. |
| Client: | Hidrocentral do Minho |


