Hydropower Plant Lutz
PROJECT DETAILS
| Project ID: [21723] | |
| Country: | Austria |
| City: | Voralberg |
| Year: | 2012 |
| Application: | Hydropower |
| Installation: | Open Trench |
| Technology: | Flowtite |
| Total Length: | 3360 m |
| Nominal Diameter DN: | 2600 | 2600 mm |
| Nominal Pressure PN: | 10 | 10 bar |
| Nominal Stiffness SN: | 5000 | 5000 N/m2 |
| Contractor: | ARGE |
| Client: | Voralberger Illwerke AG |


