Hydropower Plant Mariensee – Aspangberg
.
More information about this application
PROJECT DETAILS
| Project ID: [34390] | |
| Country: | Austria |
| City: | Aspangberg |
| Year: | 2017 |
| Application: | Hydropower |
| Installation: | Open Trench |
| Technology: | Hobas |
| Total Length: | 684 m |
| Nominal Diameter DN: | 700 mm |
| Nominal Pressure PN: | 4 bar |
| Nominal Stiffness SN: | 5000 N/m2 |
| Contractor: | DI Thomas Schenker |
| Client: | DI Thomas Schenker |

