Hylla kraftverk
PROJECT DETAILS
| Project ID: [20891] | |
| Country: | Norway | 
| City: | Engerdal | 
| Year: | 2015 | 
| Application: | Hydropower | 
| Installation: | Open Trench | 
| Technology: | Flowtite | 
| Total Length: | 3270 m | 
| Nominal Diameter DN: | 800 | 800 mm | 
| Nominal Pressure PN: | 6 | 25 bar | 
| Nominal Stiffness SN: | 5000 | 5000 N/m2 | 
| Consultant: | Norconsult AS | 
| Contractor: | Per Hagen AS | 
| Client: | Eidsiva Vannkraft AS | 


