Installation of a sewer network by jacking beneath the future LGV railway line that will connect the city of Tours to the city of Bordeaux
PROJECT DETAILS
| Project ID: [6184] | |
| Country: | France |
| City: | Veigne |
| Year: | 2014 |
| Application: | Sewer |
| Installation: | Microtunneling |
| Technology: | Hobas |
| Total Length: | 276 m |
| Nominal Diameter DN: | 1400 mm |
| Nominal Pressure PN: | 1 bar |
| Nominal Stiffness SN: | 100000 N/m2 |


