INTERCONNECTION WORKS – OUED EL MAKHAZINE Dam with DAR KHROFA Dam – Lot 2: Section 2 of supply pipeline
PROJECT DETAILS
Country: | Morocco |
City: | Dar Khrofa |
Year: | 2024 |
Application: | Potable Water |
Installation: | Open Trench |
Technology: | Flowtite |
Total Length: | 30210 m |
Nominal Diameter DN: | 1800 mm |
Nominal Pressure PN: | 10 | 16 | 20 bar |
Nominal Stiffness SN: | 10000 N/m2 |
Contractor: | STAM CAPEP |