ISTANBUL (TURKEY) PROJECT
PROJECT DETAILS
| Project ID: [32532] | |
| Country: | Turkey |
| Year: | 1998 |
| Application: | Potable Water |
| Installation: | Open Trench |
| Technology: | Flowtite |
| Total Length: | 1890000 m |
| Nominal Diameter DN: | 100 mm |
| Contractor: | ISKI |
| Client: | ISKI |
© Amiblu Holding GmbH, 2025

How much pipe is used for the world’s largest desalination plant?