King Faisal University Permanent Campus
PROJECT DETAILS
| Project ID: [30023] | |
| Country: | Saudi Arabia | 
| Year: | 2003 | 
| Application: | Drainage | 
| Installation: | Open Trench | 
| Technology: | Flowtite | 
| Total Length: | 204 m | 
| Nominal Diameter DN: | 400 | 400 mm | 
| Nominal Pressure PN: | 16 bar | 
| Contractor: | Faisal Electro-Mechanical Co. | 
| Client: | Municipality | 


