Kraftwerk Pack/Teigitsch
PROJECT DETAILS
| Country: | Austria |
| City: | Bleiburg |
| Year: | 2024 |
| Application: | Hydropower |
| Installation: | Open Trench |
| Technology: | Flowtite |
| Total Length: | 2000 m |
| Nominal Diameter DN: | 1200 | 1300 | 1400 | 1600 mm |
| Nominal Pressure PN: | 10 | 10 | 10 | 10 bar |
| Nominal Stiffness SN: | 5000 | 5000 | 5000 | 5000 N/m2 |
| Contractor: | Neromylos GmbH |
| Client: | Neromylos GmbH |
