Łódź – Budowa KD w Ul. Telefonicznej
PROJECT DETAILS
| Country: | Poland |
| City: | Łódź |
| Year: | 2023 |
| Application: | Retention System, Drainage |
| Installation: | Open Trench |
| Technology: | Hobas |
| Total Length: | 880 m |
| Nominal Diameter DN: | 1200 | 600 mm |
| Nominal Pressure PN: | 1 | 1 bar |
| Nominal Stiffness SN: | 16 | 10 N/m2 |
