LOT 2: Construction of second section of distribution pipeline (PK 9.75 to PK 34.9)
PROJECT DETAILS
| Country: | Morocco |
| City: | Tafilalet |
| Year: | 2021 |
| Application: | Irrigation |
| Installation: | Open Trench |
| Technology: | Flowtite |
| Total Length: | 23690 m |
| Nominal Diameter DN: | 400 | 1300 mm |
| Nominal Pressure PN: | 10 | 16 bar |
| Nominal Stiffness SN: | 5000 N/m2 |
| Contractor: | STAM |
