R.C. Cont. No. 172-CO2
PROJECT DETAILS
| Project ID: [23649] | |
| Country: | Saudi Arabia |
| Year: | 2008 |
| Application: | Seawater |
| Installation: | Open Trench |
| Technology: | Flowtite |
| Total Length: | 22876 m |
| Nominal Diameter DN: | 500 | 1400 mm |
| Nominal Pressure PN: | 10 | 16 bar |
| Contractor: | Al-Harbi Trading |
| Client: | Royal Commission |


