Realisatie A-pier
PROJECT DETAILS
| Country: | Netherlands |
| City: | Schiphol |
| Year: | 2022 |
| Application: | Drainage |
| Installation: | Open Trench |
| Technology: | Hobas |
| Total Length: | 210 m |
| Nominal Diameter DN: | 350 | 600 mm |
| Nominal Pressure PN: | 1 | 1 bar |
| Nominal Stiffness SN: | 16000 | 16000 N/m2 |
| Contractor: | VolkerInfra Schiphol VOF |
| Client: | Luchthaven Schiphol NV |
