REPLAC.&SUPPORT OF WATER MAINLINE
PROJECT DETAILS
| Project ID: [24139] | |
| Country: | Saudi Arabia |
| City: | Riyadh |
| Year: | 2008 |
| Application: | Potable Water |
| Installation: | Open Trench |
| Technology: | Flowtite |
| Total Length: | 24800 m |
| Nominal Diameter DN: | 300 | 400 mm |
| Contractor: | IBRAHIM MOFAWEZ & BROS. FOR CONTG. |


