Retention system DN 3000 Oed Öhling
PROJECT DETAILS
| Project ID: [35358] | |
| Country: | Austria |
| City: | Oed-Öhling |
| Year: | 2019 |
| Application: | Retention System |
| Installation: | Open Trench |
| Technology: | Hobas |
| Total Length: | 40 m |
| Nominal Diameter DN: | 3000 mm |
| Nominal Pressure PN: | 1 bar |
| Nominal Stiffness SN: | 10000 N/m2 |
| Contractor: | Franz Aichinger |
| Client: | Franz Aichinger |
