Sewerline Replacement, Khobar
PROJECT DETAILS
| Project ID: [29141] | |
| Country: | Saudi Arabia |
| City: | Al-Khobar |
| Year: | 2004 |
| Application: | Raw Water |
| Installation: | Open Trench |
| Technology: | Flowtite |
| Total Length: | 816 m |
| Nominal Diameter DN: | 400 | 400 mm |
| Nominal Pressure PN: | 16 bar |
| Contractor: | Water & Sew. Director (WSD) |


