SPPI
PROJECT DETAILS
| Project ID: [33604] | |
| Country: | Saudi Arabia |
| Year: | 1990 |
| Application: | Raw Water |
| Installation: | Open Trench |
| Technology: | Flowtite |
| Total Length: | 12 m |
| Nominal Diameter DN: | 350 | 350 mm |
| Nominal Pressure PN: | 3 bar |
| Contractor: | Kharj |
© Amiblu Holding GmbH, 2025

How much pipe is used for the world’s largest desalination plant?