Stauraumkanal mit Drachenprofil
PROJECT DETAILS
| Project ID: [35500] | |
| Country: | Germany |
| City: | Wackernheim |
| Year: | 2019 |
| Application: | Sewer, Retention System |
| Installation: | Open Trench |
| Technology: | Flowtite |
| Total Length: | 50 m |
| Nominal Diameter DN: | 2300 mm |
| Nominal Pressure PN: | 1 bar |
| Nominal Stiffness SN: | 10000 N/m2 |
| Contractor: | Knebel, Bingen |
| Client: | Abwasserzweckverb and Untere Selz, Ingelheim |
