Storm Water Project, Khobar
PROJECT DETAILS
| Project ID: [25330] | |
| Country: | Saudi Arabia |
| City: | Al-Khobar |
| Year: | 2007 |
| Application: | Drainage |
| Installation: | Open Trench |
| Technology: | Flowtite |
| Total Length: | 1550 m |
| Nominal Diameter DN: | 400 mm |
| Nominal Pressure PN: | 6 bar |
| Contractor: | Zoman Mohd. Al-Hajri |
| Client: | Municipality |


