Strengthening AEP to the city of Ouarzazate from Tiouine dam – Lots 2.2, 2.3, 2.4: Pipelines
PROJECT DETAILS
| Country: | Morocco |
| City: | Ouarzazate |
| Year: | 2016 |
| Application: | Potable Water |
| Installation: | Open Trench |
| Technology: | Flowtite |
| Total Length: | 27750 m |
| Nominal Diameter DN: | 500 | 600 mm |
| Nominal Pressure PN: | 10 | 12 | 16 bar |
| Nominal Stiffness SN: | 5000 N/m2 |
| Contractor: | STAM |
