Supply, transport, and installation of pipelines and related structures – A4 Supply & M8/M9 Distribution Networks – Annour sector
PROJECT DETAILS
Country: | Morocco |
City: | Tadla |
Year: | 2011 |
Application: | Irrigation |
Installation: | Open Trench |
Technology: | Flowtite |
Total Length: | 21502 m |
Nominal Diameter DN: | 400 | 600 | 1200 mm |
Nominal Pressure PN: | 10 bar |
Nominal Stiffness SN: | 5000 N/m2 |
Contractor: | STAM |