Syrifossen kraftverk
PROJECT DETAILS
| Project ID: [22879] | |
| Country: | Norway |
| City: | Voss |
| Year: | 2009 |
| Application: | Hydropower |
| Installation: | Open Trench |
| Technology: | Flowtite |
| Total Length: | 588 m |
| Nominal Diameter DN: | 1200 | 1200 mm |
| Nominal Pressure PN: | 6 | 16 bar |
| Nominal Stiffness SN: | 5000 | 5000 N/m2 |
| Consultant: | Bystol AS |
| Contractor: | Joh Jordalen Entreprenor |
| Client: | Syrikraft AS |


