Wastewater Treatment Plant (WWTP) Vidin
PROJECT DETAILS
| Project ID: [34834] | |
| Country: | Bulgaria |
| City: | Vidin |
| Year: | 2018 |
| Application: | Sewer |
| Installation: | Open Trench |
| Technology: | Hobas |
| Total Length: | 444 m |
| Nominal Diameter DN: | 500 | 600 | 700 | 800 mm |
| Nominal Pressure PN: | 1 bar |
| Nominal Stiffness SN: | 10000 | 15000 N/m2 |
| Contractor: | Vodstroy 98 (VDH) |
| Client: | HTI Bulgaria Ltd. |

