Water supply security – Transfer pipeline from ONEE-BO reservoir to upper-level reservoir
PROJECT DETAILS
| Country: | Morocco |
| City: | Agadir |
| Year: | 2023 |
| Application: | Potable Water |
| Installation: | Open Trench |
| Technology: | Flowtite |
| Total Length: | 5900 m |
| Nominal Diameter DN: | 1000 mm |
| Nominal Pressure PN: | 20 bar |
| Nominal Stiffness SN: | 10000 N/m2 |
| Contractor: | SOTRADEMA |
