Yanbu Air Separation Plant
PROJECT DETAILS
| Project ID: [32783] | |
| Country: | Saudi Arabia |
| City: | Yanbu |
| Year: | 1997 |
| Application: | Chemical Industry |
| Installation: | Open Trench |
| Technology: | Flowtite |
| Total Length: | 372 m |
| Nominal Diameter DN: | 500 | 1200 mm |
| Nominal Pressure PN: | 6 bar |
| Contractor: | Linarco Ltd. |
| Client: | Sabic |


