Zenica, V-C Corridor, Viaducts D.Gračanica, Bosna, Jelovik
PROJECT DETAILS
| Country: | Bosnia and Herzegovina |
| City: | Zenica |
| Year: | 2020 |
| Application: | Drainage |
| Installation: | Above Ground |
| Technology: | Hobas |
| Total Length: | 2034 m |
| Nominal Diameter DN: | 200 | 250 | 300 | 350 mm |
| Nominal Pressure PN: | 1 bar |
| Nominal Stiffness SN: | 10000 N/m2 |
| Contractor: | Regeneracija |
| Client: | Motorways of FBiH |
