Above Ground

LinkCountryYearTotal Length [m]Nominal Diameter DN [mm]Nominal Pressure PN [bar]Nominal Stiffness SN [N/m2]TechnologyPDF
RFQ_AESA Argentina Argentina 2019 662 800 4 1250 Flowtite
117025 Entre Rios Bolivia 2017 1240 250 | 700 | 1000 16 2500 Flowtite
17198 CCPP Project Renaissance (Jamaica) Jamaica 2018 968 200 | 600 | 1600 | 2400 10 2500 Flowtite
17255 – Refinería Petroperú Talara Peru 2018 632 150 | 1500 16 2500 Flowtite
Viadotto Barberino del Mugello Italy 2019 258 400 | 500 1 10000 Hobas
Chiusa (BZ) viadotto A22 KM 55 Italy 2019 2493 200 | 250 1 10000 Hobas
Drenaggio viadotto fiume Mignone – A12 Italy 2019 177 400 1 10000 Hobas
Drenaggio ponte zona Bolzano Italy 2019 336 250 | 350 | 500 1 10000 Flowtite
Švihov – D1 – odvodnění mostu Czech Republic 2019 396 200 1 10000 Flowtite
D1 – odvodnění mostu Czech Republic 2019 435 200 | 300 | 400 1 10000 Hobas
Hodonín – odvodnění mostu Czech Republic 2019 156 200 1 10000 Hobas
Rudolice – odvodnění mostu Czech Republic 2019 90 200 1 10000 Hobas
Sokolov – odvodnění mostu Czech Republic 2019 570 200 1 10000 Flowtite
Trstěnice – Drmoul – odvodnění mostu Czech Republic 2019 136 200 1 10000 Hobas
Šlapanicko – Watertank Tvarožná 2×100 m³ Czech Republic 2020 42 3000 1 5000 Hobas
Šlapanicko – Watertank Pozořice 2×100 m³ Czech Republic 2020 42 3000 1 5000 Hobas
Damnice – Watertank Miroslavské Knínice 2×85 m³ Czech Republic 2020 36 3000 1 5000 Hobas
Jedovnicko – Watertank Harbechy 2×100 m³ Czech Republic 2021 42 3000 1 5000 Hobas
Čapljina, Bugojno, Ključ, Jelah Bosnia and Herzegovina 2019 696 200 | 250 1 5000 Hobas
Banja Luka – Zeleni most Bosnia and Herzegovina 2019 160 200 1 10000 Hobas
Pehare i Babina rijeka bridges Bosnia and Herzegovina 2019 816 200 | 250 | 300 1 5000 Hobas
Svilaj, bridge over Sava Bosnia and Herzegovina 2019 1080 300 1 10000 Hobas
Viaduct Ričice Bosnia and Herzegovina 2019 360 200 | 250 1 10000 Hobas
Karaula bridge Bosnia and Herzegovina 2019 306 200 1 10000 Hobas
V-C, Zenica bypass, Drivuša, Klopče, Klopačke stijene bridges Bosnia and Herzegovina 2019 822 200 | 250 1 10000 Hobas
Highway Bar-Boljare Section 1 Moračica bridge Montenegro 2019 2000 200 | 300 | 400 | 500 1 5000 Hobas
Highway Bar Boljare bridges and overpasses drainage Section 2 Montenegro 2019 576 250 | 300 1 5000 Hobas
Highway Bar Boljare bridges and overpasses drainage Section 3 Montenegro 2019 1575 250 | 300 1 10000 Hobas
Highway Bar Boljare bridges and overpasses drainage Section 4 Montenegro 2019 7356 250 | 300 | 400 | 500 1 5000 Hobas
Trinkwasserbehälter Sehmatal Germany 2019 7 3000 1 2500 Flowtite

Data

Technical data

Diameter, pressure, stiffness, and so much more… All the technical hard facts you need to plan, lay, and operate our pipelines.

References

Reference database

Over 30,000 projects in over 125 countries in over 60 years: Discover spectacular and technically challenging construction works with Amiblu’s technologies (Flowtite, Hobas, Amiblu, Amiscreen) in our reference database.

Footprint

Our footprint

We aim to have life cycle assessments for all products by end of 2022 and a carbon-neutral pipe production by 2030. We use the resources we have—our business, our voice, and our network—to fight the climate crisis and inspire people around the globe to value water as we should.