Installation

LinkCountryYearTotal Length [m]Nominal Diameter DN [mm]Nominal Pressure PN [bar]Nominal Stiffness SN [N/m2]TechnologyPDF
Rury Hobas PU Line w projekcie budowy zbiornika Roztoki Bystrzyckie Poland 2021 540 3600 1 16000 Hobas
Regenwassermanagement in Mülheim an der Ruhr Germany 2021 2000 | 2300 | 2600 | 2800 1 Amiblu
Dieppe (76) / Réhabilitation du réseau ovoïde d’eaux pluviales situé sous le Cours de Dakar à l’aide de tuyaux NC France 2019-2020 1000 Non-Circular | 1000 1 Amiblu
New wastewater treatment plant for Beirolas Portugal 2019 800 | 1200 | 1800 6 5000 Flowtite
Unsafe bridge culvert restored for future generations United Kingdom 2020 4 1600 1 10000 Hobas
Resilient stormwater management in Preston, UK United Kingdom 2018 530 1400 | 1200 6 5000 Flowtite
Damaged sewer relined and restored with Amiblu jacking pipes United Kingdom 2020 32 900 1 10000 Hobas
Acondicionamiento Avenida Francisco Montenegro Spain 2019 5100 400 10 5000 Flowtite
Balsa elevada y parque solar fotovoltaico Marcén, Lalueza (Huesca) Spain 2019 830 900 10 10000 Flowtite
Canal de la Maya (Fase II) _TSA000066669 Spain 2019 5461 400 | 500 | 600 | 700 10 5000 Flowtite
Colector de pluviales Avda. de los Liros y Calle San Valentín Spain 2019 180 800 | 1000 1 5000 Flowtite
Colector General de Marín (Pontevedra) Spain 2019 344 1200 1 5000 Flowtite
Colector Margen Izqda Ría Mundaka Spain 2019 938 1000 6 5000 Flowtite
Colector obras pluviales en Alcora Spain 2019 120 1600 1 10000 Flowtite
Colectors casernes Sant Andreu Spain 2019 174 1200 1 5000 Flowtite
Conexiones Exteriores del Parque de A. E. de Arteixo Acteca Spain 2019 789 500 | 600 | 800 1 10000 Flowtite
CR Canal del Pisuerga sector A Spain 2019 2273 400 | 500 | 700 10 5000 Flowtite
CR Canal del Pisuerga sector B Spain 2019 2576 400 | 500 10 5000 Flowtite
EDAR de Rianxo Spain 2019 796 600 | 800 | 1200 1 10000 Flowtite
Habilitaciones Z.I. Glorieta vial acceso Muelles Langosteira A2 Spain 2019 239 600 | 800 1 10000 Flowtite
Kronospan naves antiguas Spain 2019 234 800 1 10000 Flowtite
Mejora infraestructura hidráulica Barriada del Rosario, Santiponce Spain 2019 140 1000 1 10000 Flowtite
Mejora red de colectores de Coslada Spain 2019 126 1400 1 5000 Flowtite
Melloras no saneamento en Cabanas e Pontedeume Fase 1 Spain 2019 972 800 | 1000 | 1200 | 1400 1 5000 Flowtite
Mod.Regadios C.R.Blanca Spain 2019 96 800 10 10000 Flowtite
Modernización Canal de Zorita (Salamanca), TSA000066940 Spain 2019 7836 400 | 500 | 600 10 5000 Flowtite
Obra civil Syncrolift Muelle Cataluña en Puerto Barcelona Spain 2019 534 200 | 300 | 400 1 5000 | 10000 Flowtite
Pluviales ENCE Spain 2019 576 1200 1 5000 | 10000 Flowtite
Pluviales FINSA Spain 2019 203 1000 1 5000 | 10000 Flowtite
Projecte de Reurbanització del carrer Sant Joan de Malta Spain 2019 132 1000 1 10000 Flowtite

Data

Technical data

Diameter, pressure, stiffness, and so much more… All the technical hard facts you need to plan, lay, and operate our pipelines.

References

Reference database

Over 30,000 projects in over 125 countries in over 60 years: Discover spectacular and technically challenging construction works with Amiblu’s technologies (Flowtite, Hobas, Amiblu, Amiscreen) in our reference database.

Footprint

Our footprint

We aim to have life cycle assessments for all products by end of 2022 and a carbon-neutral pipe production by 2030. We use the resources we have—our business, our voice, and our network—to fight the climate crisis and inspire people around the globe to value water as we should.