Who we are
What we do
Resources for you
Link | Country | Year | Total Length [m] | Nominal Diameter DN [mm] | Nominal Pressure PN [bar] | Nominal Stiffness SN [N/m2] | Technology | |
---|---|---|---|---|---|---|---|---|
Carlisle WWTW (Phase 2) – Resilience Works with Flowtite Gravity & Pressure Pipes | United Kingdom | 2022 | 312 | 1000 | 1 | 6 | 10 | 5000 | Flowtite | |
Olomouc | Czech Repulic | 2021 | 60 | 300 | 1 | 10000 | Flowtite | |
Olomouc | Czech Repulic | 2021 | 126 | 300 | 1 | 10000 | Flowtite | |
ETAP Manises | Spain | 2021 | 200 | 1200 | 1400 | 1 | 6 | 10000 | Flowtite | |
Autovia A57 Vilaboa – Ermida | Spain | 2021 | 432 | 300 | 1 | 10000 | Flowtite | |
Actuaciones de defensa del Guadalhorce | Spain | 2021 | 1092 | 1000 | 10 | 10000 | Flowtite | |
Mejora Edar y Ebar 4 Boadilla del Monte | Spain | 2021 | 45 | 1000 | 1 | 10000 | Flowtite | |
Reparaciones Licuas Arroyo Culebro | Spain | 2021 | 18 | 1600 | 1 | 10000 | Flowtite | |
Colector en Umbrete – Aljarafesa | Spain | 2021 | 42 | 1000 | 1 | 10000 | Flowtite | |
EDAR Arroyo del Soto en Móstoles | Spain | 2021 | 28 | 1000 | 1200 | 10 | 5000 | Flowtite | |
Relining A23 PK 110+845 GLOBALVIA | Portugal | 2021 | 62 | 2100 | 1 | 10000 | Flowtite | |
Relining A23 PK 104+100 GLOBALVIA | Portugal | 2021 | 50 | 2100 | 1 | 10000 | Flowtite | |
Relining EN238 PH12.5 | Portugal | 2021 | 78 | 1800 | 1 | 10000 | Flowtite | |
Relining A25 PH342 | Portugal | 2021 | 152 | 1127 | 1 | 10000 | Flowtite | |
Relining A25 PH583 PH585 | Portugal | 2021 | 40 | 1000 | 1 | 10000 | Flowtite | |
Tuberia PRFV 1500 MM El Escorial, PACSA | Spain | 2021 | 247 | 1000 | 1500 | 1 | 5000 | Flowtite | |
Renovación Saneamiento Paseo Universidad | Spain | 2021 | 448 | 600 | 800 | 1000 | 1400 | 1 | 10000 | Flowtite | |
Saneamiento en Meira | Spain | 2021 | 642 | 600 | 700 | 1 | 5000 | Flowtite | |
Pilotes puerto de Vigo | Spain | 2021 | 546 | 300 | 1 | 5000 | Flowtite | |
FCC-AQUALIA. LOTE 3 | Spain | 2021 | 114 | 1200 | 20 | 10000 | Flowtite | |
PUERTO EXTERIOR HABILITACIÓN ZONA 3 | Spain | 2021 | 690 | 600 | 800 | 1000 | 1 | 10000 | Flowtite | |
Aduana de Burgos | Spain | 2021 | 3032 | 500 | 800 | 1200 | 1400 | 1 | 5000 | Flowtite | |
Vitoria – Saneamiento Barrio del Pilar | Spain | 2021 | 45 | 1200 | 1 | 10000 | Flowtite | |
Saneamiento Valladolid 21 | Spain | 2021 | 306 | 1200 | 1 | 10000 | Flowtite | |
Colector en Albaida de Aljarafe | Spain | 2021 | 208 | 1000 | 1200 | 1 | 10000 | Flowtite | |
Saneamiento Aracena | Spain | 2021 | 30 | 1200 | 10 | 10000 | Flowtite | |
es-valladolid – Varios Saneriego | Spain | 2021 | 114 | 800 | 900 | 16 | 10000 | Flowtite | |
Plaza del Caño en Torrelodones | Spain | 2021 | 414 | 1000 | 1200 | 1500 | 1 | 10000 | Flowtite | |
Depositos Samesa 2 | Spain | 2021 | 23 | 2200 | 1 | 2500 | Flowtite | |
Valdeorras – Relining Valdeorras | Spain | 2021 | 43 | 1400 | 1 | 10000 | Flowtite |
© Amiblu Holding GmbH, 2022
Data
Diameter, pressure, stiffness, and so much more… All the technical hard facts you need to plan, lay, and operate our pipelines.
References
Over 30,000 projects in over 125 countries in over 60 years: Discover spectacular and technically challenging construction works with Amiblu’s technologies (Flowtite, Hobas, Amiblu, Amiscreen) in our reference database.
Footprint
We aim to have life cycle assessments for all products by end of 2022 and a carbon-neutral pipe production by 2030. We use the resources we have—our business, our voice, and our network—to fight the climate crisis and inspire people around the globe to value water as we should.