Relining

Link Country Year Total Length [m] Nominal Diameter DN [mm] Nominal Pressure PN [bar] Nominal Stiffness SN [N/m2] Technology PDF
NC relining in L.A. with GRP pipes made in Poland United States of America 2018 3660 Flowtite
Hobas GRP pipes for project Zbudovské aquadukty Czech Republic 2017 12 1000 1 16000 Hobas
Fót, aknabélelés Hungary 2017 5 1940 1 10000 Hobas
Ełk-Renowacje Poland 2017 425 900 | 1000 1 | 1 10000 | 10000 Flowtite
Kraków al. Mickiewicza i Krasińskiego DN 1280/1780 Poland 2017 2155 Non-Circular Flowtite
Kraków al. Słowackiego DN 800/1200 Poland 2017 1098 Non-Circular Flowtite
Kraków Romanowicza DN 1200/1800 Poland 2017 642 Non-Circular Flowtite
Gdańsk ul. Cementowa Poland 2017 347 900 1 Flowtite
Szczecin Pomorska Poland 2017 348 1200 1 10000 Flowtite
Kiev Revutskoho Ukraine 2017 150 2000 1 5000 Flowtite
Kiev Zarechnij DN2000 SN5 Ukraine 2017 516 2000 1 5000 Flowtite
Bournemouth, H₂S corroded sewer restoration with Flowtite relining pipes United Kingdom 2018 200 1600 1 10000 Flowtite
Rio Subterraneo, Relining of DN 3000 Tunnel with divers in 20 m depth during operation Argentina 2017 216 2500 2 20000 Hobas
Sewer rehabilitation with Hobas GRP pipes Germany 2017 485 1720 | 1000 | 3000 1 Hobas
Large Diameter Sewer Relining with NC Line in Southern France France 2017 6400 Non-Circular 1
Kyiv Pt. Peremohy71-a Ukraine 2016 72 200 | 600 1 5000 | 10000 Hobas
Collector Zolochiv Ukraine 2016 60 600 1 5000 Hobas
Lviv Stusa street Ukraine 2016 824 800 | 1000 | 1600 1 5000 | 10000 Hobas
Kalisz Niecala Street part II Poland 2016 28 400 1 10000 Hobas
Relining in Torino Italy 2015 54 1600 1 5000 Hobas
Reinforcement of a SNCF culvert under railways thanks to NC Line elements DN 530×790 on the Nevers / Chagny SNCF line (71) France 2015 57 Non-Circular Hobas
Reinforcement of 3 metal culverts PR 160+530 with relined NC elements DN 3000×1800 on the A36 motorway in Lavans les Dole (39) France 2015 265 Non-Circular Hobas
Reinforcement of the PH178A and PH178B metal culverts with relined NC elements DN 1932×1405 on the A10 motorway in Longvilliers (78) France 2015 106 Non-Circular Hobas
Sewer and stormwater network’s rehabilitation on the cities of Marnes la Coquette, Ville d’Avray and Sevres (92) DN 1366×736, 1564×654 and 1662×922 France 2015 1400 Non-Circular Hobas
Rehabilitation of the hydraulic structure des Lassieux under the motorway A63 in Salles (33), installation of crossings for animals and obstacles on the invert to reduce the flow France 2015 87 2200 1 10000 Hobas
Structural rehabilitation of the Gascogne Paper sea outfall in Mimizan (40) DN 920×1610 France 2015 120 Non-Circular Hobas
Reinforcement of metal culverts with relined NC elements on the A13 motorway in Les Authieux sur Calonne (14) DN 2677×1703 France 2015 72 Non-Circular | 2400 1 5000 Hobas
Rehabilitation of a waterway under the A81 motorway between Laval and Le Mans (53) by relining France 2015 132 3600 1 10000 Hobas
NC Line (520/910 and 500/750 mm) Smurfit Kappa Nettingsdorfer, Paper Industry Austria 2015 350 Non-Circular Hobas
Customized NC Hobas Profiles for Sewer Rehabilitation near Paris France 2015 1400 Non-Circular Hobas