Øvre Storelvi kraftverk
PROJECT DETAILS
| Country: | Norway |
| City: | Veitastrond |
| Year: | 2021 |
| Application: | Hydropower |
| Installation: | Open Trench |
| Technology: | Flowtite |
| Total Length: | 81 m |
| Nominal Diameter DN: | 2200 | 2400 mm |
| Nominal Pressure PN: | 6 bar |
| Nominal Stiffness SN: | 5000 N/m2 |
| Consultant: | Bystøl AS |
| Client: | Forte Vannkraft |

