Cooling and Process Water

LinkCountryYearTotal Length [m]Nominal Diameter DN [mm]Nominal Pressure PN [bar]Nominal Stiffness SN [N/m2]TechnologyPDF
Ostrołęka Elektrownia Poland 2020 276 3000 6 10000 Flowtite
Nowa Sarzyna Poland 2020 462 500 10 10000 Hobas
Kremenchug FERREXPO Poltava ESTACADE Ukraine 2020 2203 400 | 500 6 | 6 10000 | 10000 Flowtite
Puławy-Budowa bl.energet-kształtki Poland 2020 546 1200 | 1000 | 700 | 500 6 | 6 | 6 | 6 10000 | 10000 | 10000 | 10000 Flowtite
Sea Water intake Brazil (LNG Terminal) Brazil 2019 7123 600 | 700 | 900 | 1500 16 | 20 10000 Hobas
RFQ_AESA Argentina Argentina 2019 662 800 4 1250 Flowtite
17198 CCPP Project Renaissance (Jamaica) Jamaica 2018 968 200 | 600 | 1600 | 2400 10 2500 Flowtite
Cooling water system by Amiblu for thermoelectric plants in Bolivia Bolivia 2018-2019 approx. 3510 700 | 1000 | 25 | 250 16 2500 Flowtite
GRP Cooling water system for power plant Opole Poland 2015-2016 730 3400 10 10000 Flowtite
GRP Cooling water system for power plant Jaworzno Poland 2017-2018 5000 3600 | 2400 | 1800 10 10000 Flowtite
Hobas GRP pipes for project Lovochemie přepoj u budovy SO 0290 Czech Republic 2017 1000 10 10000 Hobas
Puławy instalacja rurociągów podziemnych wody chłodzącej – Zakłady Azotowe Poland 2017 325 350 | 900 | 1250 6 16000 Hobas
Puławy – ZAP Melaminy II & III Poland 2017 30 300 | 500 | 900 10 10000 Hobas
Głowgów, Modernizacja chłodni 1 celkowej w HM Głogów Poland 2017 16 500 1 5000 Hobas
EC Stalowa Wola Poland 2017 414 2160 32000 Flowtite
Hydroelektrownia Dwory Poland 2017 171 3600 1 5000 Flowtite
Jaworzno Elektrownia – Maszynownia Poland 2017 110 3600 10 10000 Flowtite
Katowice DK81 i DK86 et.IV Poland 2017 3966 300 | 400 | 600 | 800 1 | 1 | 1 | 1 10000 | 10000 | 10000 | 10000 Flowtite
Astravec Nuclear Power Station Belarus Belarus 2017 250 | 300 | 350 | 400 6 | 6 | 6 | 6 5000 | 5000 | 5000 | 5000 Flowtite
Hobas GRP pipes for Siemens Mega Project in Egypt Egypt 2016-2017 260 2500 | 600 4 5000 Hobas
Aanakoski Metsa Fibre BTT Area 9 SW pipes Finland 2016 18 300 | 600 1 10000 Hobas
E30 Wola Redzinska protective pipe for heating pipelines Poland 2016 86 500 | 1000 1 128000 | 320000 Hobas
KPP Sea Water Line 2016, NJ Finland 2016 267 600 1 10000 Hobas
Aanekoski MF BTT RW 1200 and Area 9 Spares Finland 2016 12 600 | 1200 1 10000 Hobas
Aanakoski, MF BTT Teravaniemi WWTP SW pipe Finland 2016 203 1000 1 10000 Hobas
Cracow Golaska protective pipe for heating pipelines Poland 2016 30 600 1 128000 Hobas
Aanekoski Metsa Fibre BTT Area 9 Finland 2016 6 400 1 10000 Hobas
Aanekoski, Metsa Fibre WK40 Service Break Finland 2016 110 300 | 800 | 1000 1 10000 Hobas
Warsaw Warynskiego Street, protective pipe Poland 2016 925 200 | 400 | 500 | 1300 1 10000 | 20000 Hobas
Kemi, Stora Enso Veitsiluoto Mill Finland 2016 240 400 6 10000 Hobas

Data

Technical data

Diameter, pressure, stiffness, and so much more… All the technical hard facts you need to plan, lay, and operate our pipelines.

References

Reference database

Over 30,000 projects in over 125 countries in over 60 years: Discover spectacular and technically challenging construction works with Amiblu’s technologies (Flowtite, Hobas, Amiblu, Amiscreen) in our reference database.

Footprint

Our footprint

We aim to have life cycle assessments for all products by end of 2022 and a carbon-neutral pipe production by 2030. We use the resources we have—our business, our voice, and our network—to fight the climate crisis and inspire people around the globe to value water as we should.