• Contact Us
  • English
  • Български Български Bulgarian bg
  • English English English en
  • Français Français French fr
  • Deutsch Deutsch German de
  • Polski Polski Polish pl
  • Русский Русский Russian ru
  • Español Español Spanish es
  • Čeština Čeština Czech cs
  • Dansk Dansk Danish da
  • Magyar Magyar Hungarian hu
  • Italiano Italiano Italian it
  • Nederlands Nederlands Dutch nl
  • Norsk Norsk Norwegian no
  • Svenska Svenska Swedish sv
  • Română Română Romanian ro
  • Slovenčina Slovenčina Slovak sk
  • Português Português Portuguese pt-pt
Search Search
Amiblu
  • Products
    • Product Selector
    • Online Product Catalog
    • Non-pressure pipes
    • Pressure pipes
    • Jacking pipes
    • Non-circular pipes (NC Line)
    • PROX pipes
    • Joints and Couplings
    • Fittings
  • Applications
    • Reference Database
    • Wastewater
    • CSO system with solid retention
    • Potable water
    • Hydropower
    • Trenchless Applications
    • Special Pipes
    • Irrigation
    • Industry
  • Technologies
    • Centrifugal Casting (Hobas Technology)
    • Filament Winding (Flowtite Technology)
    • NC Line Technology
    • Certificates
  • Why GRP
    • Green
    • Footprint
    • Environmental responsibility of GRP
    • Economic responsibility of GRP
    • Social responsibility of GRP
    • Environmental Product Declarations
  • Company
    • About Us
    • Contact Us
    • News
    • Jobs
    • Compliance
  • Downloads
  • Menu Menu
You are here: Home1 / Pipelines2 / Drainage
Trstěnice - Drmoul - odvodnění mostu

Milíčovice - culverts

Čapljina, Bugojno, Ključ, Jelah

Sarajevo, Public garage Stari grad

Banja Luka - Zeleni most

Pehare i Babina rijeka bridges

Svilaj, bridge over Sava

Viaduct Ričice

Karaula bridge

V-C, Zenica bypass, Drivuša, Klopče, Klopačke stijene bridges

Semizovac - rondo

Highway Bar-Boljare Section 1 Moračica bridge

Highway Bar Boljare bridges and overpasses drainage Section 2

Highway Bar Boljare bridges and overpasses drainage Section 3

Highway Bar Boljare bridges and overpasses drainage Section 4

Ljubljana Ikea

Kolubara, bridge

Flowtite GRP pipes at Düsseldorf Airport by night
Relining with GRP drainage pipes at Düsseldorf Airport

2 bestaande kokers relingen te Elsloo

3 boringen Katwijk

RAI Wielingenstraat fase 3

SPL P1: Rijbaan A8 Schiphol

boring/relining Schiedam

Grote kruising Krimpen a/d Ijssel

4500767107 SPL P1 Afvoerleiding GH baai

4500770008/G,006468 HSVBT Schiphol GH-Baai

3x GFT boringen Doesburg

4500824659/G.006637 SPL P1:Rijbaan A thv VOP F9

WE-Haarlemmermeer Schiphol A-pier/180641

WE-Haarlemmermeer Schiphol A-pier/180641

Page 7 of 87«‹56789›»

Who we are

Contact us
Career
About us
News

What we do

Footprint
Products
References
GRP

Resources for you

Brochures
Product guide
Technical documents
Videos

Join us

  • English

    Data

    Technical data

    Diameter, pressure, stiffness, and so much more… All the technical hard facts you need to plan, lay, and operate our pipelines.

    Get Info

    References

    Reference database

    Over 30,000 projects in over 125 countries in over 60 years: Discover spectacular and technically challenging construction works with Amiblu’s technologies (Flowtite, Hobas, Amiblu, Amiscreen) in our reference database.

    Start browsing

    EPDs

    Environmental Product Declarations

    Our EU-standardized EPDs provide transparent, verified and comparable information on the environmental impact of more than 1200 Amiblu products throughout their life cycle.

    Learn more

    © Amiblu Holding GmbH, 2025

    Copyright      Disclaimer      GTC      Privacy Policy

    Scroll to top