• Contact Us
  • English
  • Български Български Bulgarian bg
  • English English English en
  • Français Français French fr
  • Deutsch Deutsch German de
  • Polski Polski Polish pl
  • Русский Русский Russian ru
  • Español Español Spanish es
  • Čeština Čeština Czech cs
  • Dansk Dansk Danish da
  • Magyar Magyar Hungarian hu
  • Italiano Italiano Italian it
  • Nederlands Nederlands Dutch nl
  • Norsk Norsk Norwegian no
  • Svenska Svenska Swedish sv
  • Română Română Romanian ro
  • Slovenčina Slovenčina Slovak sk
  • Português Português Portuguese pt-pt
  • Ukrainian Ukrainian Ukrainian ua
Search Search
Amiblu
  • Products
    • Product Selector
    • Online Product Catalog
    • Non-pressure pipes
    • Pressure pipes
    • Jacking pipes
    • Non-circular pipes (NC Line)
    • PROX pipes
    • Joints and Couplings
    • Fittings
  • Applications
    • Reference Database
    • Wastewater
    • CSO system with solid retention
    • Potable water
    • Hydropower
    • Trenchless Applications
    • Special Pipes
    • Irrigation
    • Industry
  • Technologies
    • Centrifugal Casting (Hobas Technology)
    • Filament Winding (Flowtite Technology)
    • NC Line Technology
    • Certificates
  • Why GRP
    • Green
    • Footprint
    • Environmental responsibility of GRP
    • Economic responsibility of GRP
    • Social responsibility of GRP
    • Environmental Product Declarations
  • Company
    • About Us
    • Contact Us
    • News
    • Jobs
    • Compliance
  • Downloads
  • Menu Menu
You are here: Home1 / Technology2 / Hobas
GRP pipes slipling in Ploiesti
Slipling with GRP Pipes of an Existing Egg-Shaped Concrete Channel in Ploiesti

Microtunneling Jacking Pipes in Rennes
Microtunneling Jacking Pipes for a Combined Sewage Collector in Rennes

Potable Water Pipeline Replacment Haskovo´s City
PN 10 / 2400m long Potable Water Pipeline Replacement for Haskovo's City

DN 3000 GRP Pump Shafts equipped with instruments for wastewater disposal in Russia
DN 3000 GRP Pump Shafts equipped with instruments for wastewater disposal in Russia

Special Profile 1000 Meter Sewer Reabilitation in Basel
Special Profile 1000 Meter Sewer Reabilitation in Basel

GRP Shafts for Deep Tunnels in Minneapolis
GRP Shafts for Deep Tunnels in Minneapolis

HOBAS Multiple Pump Shaft for the Renaturation of the Lausitz Region, Germany

Hobas GRP Microtunneling Poland
Microtunneling HOBAS GRP Culverts under the E65 Railway Line in Poland

Hydropower Plant

Hydropower Plant

Jacking Nochten

Jacking Knoten ZEKIWA

Frank Heimbach Rebstockpark

Siemens Dynamowerk

Retention system for combined sewage

Rehabilitation Prager Strasse

Sewer Schwarzwaldstrasse

Rehabilitation Schlossstrasse

Sewer Rehabilitation Viktoriastrasse

Rosslau, Kreisverkehr Sieben Säule

Outlets Oberlausitzbahn

Rehabilitation Bautzener Strasse

Expansion Charlottenstrasse

Clara-Zetkin-Strasse

Ilsenburger Strasse

Schwarze Pumpe Industrial Water

ADL 1000 Cracauer Anger

Air Pipe DN 800

Sewer Rehabilitation Chemiepark Marl

Vrbovec

Page 177 of 577«‹175176177178179›»

Who we are

Contact us
Career
About us
News

What we do

Footprint
Products
References
GRP

Resources for you

Brochures
Product guide
Technical documents
Videos

Join us

  • English

    Data

    Technical data

    Diameter, pressure, stiffness, and so much more… All the technical hard facts you need to plan, lay, and operate our pipelines.

    Get Info

    References

    Reference database

    Over 30,000 projects in over 125 countries in over 60 years: Discover spectacular and technically challenging construction works with Amiblu’s technologies (Flowtite, Hobas, Amiblu, Amiscreen) in our reference database.

    Start browsing

    EPDs

    Environmental Product Declarations

    Our EU-standardized EPDs provide transparent, verified and comparable information on the environmental impact of more than 1200 Amiblu products throughout their life cycle.

    Learn more

    © Amiblu Holding GmbH, 2025

    Copyright      Disclaimer      GTC      Privacy Policy

    Scroll to top