• Contact Us
  • English
  • Български Български Bulgarian bg
  • English English English en
  • Français Français French fr
  • Deutsch Deutsch German de
  • Polski Polski Polish pl
  • Русский Русский Russian ru
  • Español Español Spanish es
  • Čeština Čeština Czech cs
  • Dansk Dansk Danish da
  • Magyar Magyar Hungarian hu
  • Italiano Italiano Italian it
  • Nederlands Nederlands Dutch nl
  • Norsk Norsk Norwegian no
  • Svenska Svenska Swedish sv
  • Română Română Romanian ro
  • Slovenčina Slovenčina Slovak sk
  • Português Português Portuguese pt-pt
  • Ukrainian Ukrainian Ukrainian ua
Search Search
Amiblu
  • Products
    • Product Selector
    • Online Product Catalog
    • Non-pressure pipes
    • Pressure pipes
    • Jacking pipes
    • Non-circular pipes (NC Line)
    • PROX pipes
    • Joints and Couplings
    • Fittings
  • Applications
    • Reference Database
    • Wastewater
    • CSO system with solid retention
    • Potable water
    • Hydropower
    • Trenchless Applications
    • Special Pipes
    • Irrigation
    • Industry
  • Technologies
    • Centrifugal Casting (Hobas Technology)
    • Filament Winding (Flowtite Technology)
    • NC Line Technology
    • Certificates
  • Why GRP
    • Green
    • Footprint
    • Environmental responsibility of GRP
    • Economic responsibility of GRP
    • Social responsibility of GRP
    • Environmental Product Declarations
  • Company
    • About Us
    • Contact Us
    • News
    • Jobs
    • Compliance
  • Downloads
  • Menu Menu
You are here: Home1 / Technology2 / Hobas
Knittelfeld BA 05

Klagenfurt, Sanierung Feldkirchnerstr.

Klagenfurt, Sanierung Feldkirchnerstr.

Kirchschlag, Johann Kaiser, Potable Water Tank

Kirchheim/Edt BA 02, BL 01

Kanal Piesendorf ABA

Kaindorf

Illmau - Kautzen

Hochwasserschutz Engel

Hochstraden, Potable Water Tank

Hochschneeberg, Übernahmestat. u TW-Beh.

Haugschlag BA 02/4

Harbach BA 01/3 ABA

Harbach ABA BA 02/2

Gutau BA 09

Grünbach/Schneeberg, spring water tank

Grünbach/Schneeberg, spring water tank

Grossarl BA 10

Gross Schollach

Grieskirchen ABA BA 08 BE 01, BA 07 BE 03

Gottestal, Dragnitz, Stauraumkanal

Gottestal, Dragnitz, Stauraumkanal

Goss Schollach

Göllersdorf BA 07

Gmünd, ÖBB - Bahnhof

Gitschtalsammler Umlegung

Geiersberg ABA Erweiterung 2000

Gegendtal BA 115 u. BA 116 BT 3

Gaubitsch ABA

Gaspoltshofen ABA BA 07

Page 355 of 577«‹353354355356357›»

Who we are

Contact us
Career
About us
News

What we do

Footprint
Products
References
GRP

Resources for you

Brochures
Product guide
Technical documents
Videos

Join us

  • English

    Data

    Technical data

    Diameter, pressure, stiffness, and so much more… All the technical hard facts you need to plan, lay, and operate our pipelines.

    Get Info

    References

    Reference database

    Over 30,000 projects in over 125 countries in over 60 years: Discover spectacular and technically challenging construction works with Amiblu’s technologies (Flowtite, Hobas, Amiblu, Amiscreen) in our reference database.

    Start browsing

    EPDs

    Environmental Product Declarations

    Our EU-standardized EPDs provide transparent, verified and comparable information on the environmental impact of more than 1200 Amiblu products throughout their life cycle.

    Learn more

    © Amiblu Holding GmbH, 2025

    Copyright      Disclaimer      GTC      Privacy Policy

    Scroll to top