• Contact Us
  • English
  • Български Български Bulgarian bg
  • English English English en
  • Français Français French fr
  • Deutsch Deutsch German de
  • Polski Polski Polish pl
  • Русский Русский Russian ru
  • Español Español Spanish es
  • Čeština Čeština Czech cs
  • Dansk Dansk Danish da
  • Magyar Magyar Hungarian hu
  • Italiano Italiano Italian it
  • Nederlands Nederlands Dutch nl
  • Norsk Norsk Norwegian no
  • Svenska Svenska Swedish sv
  • Română Română Romanian ro
  • Slovenčina Slovenčina Slovak sk
  • Português Português Portuguese pt-pt
  • Ukrainian Ukrainian Ukrainian ua
Search Search
Amiblu
  • Products
    • Product Selector
    • Online Product Catalog
    • Non-pressure pipes
    • Pressure pipes
    • Jacking pipes
    • Non-circular pipes (NC Line)
    • PROX pipes
    • Joints and Couplings
    • Fittings
  • Applications
    • Reference Database
    • Wastewater
    • CSO system with solid retention
    • Potable water
    • Hydropower
    • Trenchless Applications
    • Special Pipes
    • Irrigation
    • Industry
  • Technologies
    • Centrifugal Casting (Hobas Technology)
    • Filament Winding (Flowtite Technology)
    • NC Line Technology
    • Certificates
  • Why GRP
    • Green
    • Footprint
    • Environmental responsibility of GRP
    • Economic responsibility of GRP
    • Social responsibility of GRP
    • Environmental Product Declarations
  • Company
    • About Us
    • Contact Us
    • News
    • Jobs
    • Compliance
  • Downloads
  • Menu Menu
You are here: Home1 / Pipelines
Supply and installation of pipelines – Ouaed Cherkane (Lot 1: 12.85 km) – Dar Khrofa perimeter

Supply and installation of pipelines – Maraa Kantra (Lot 2: 4.65 km) – Dar Khrofa perimeter

Construction of main irrigation line (right bank) supplying the BOUHOUDA perimeter

Replacement of irrigation pipelines for sub-sectors A, B1/B2 and E1/E2 – R’mel sector – Loukkos perimeter – Lot 1: sub-sector A

Lot 2: sub-sectors B1 and B2

Lot 3: sub-sectors E1 and E2

Lot 1: Irrigation network for Koudiat Aabou sector

Lot 2: Irrigation network for Vallée Makhazine sector

Lot 3: Irrigation network for Bni Kmeh 2 sector

Supply and installation of main pipelines – Ouled Saïd, Skhirate, and Taourirt sub-sectors – Tessaout Amont perimeter

Supply and installation of 2nd section of main pipeline

AEP for the city of Tetouan and its coastal area from the Oued Martil dam – Lot 2.2: Treated water pipelines

Supply, transport, and installation of supply pipelines (incl. related works) – ASJEN irrigated perimeter – Ouezzane Province

Irrigation reinforcement for the Amghass Aval perimeter – from Ait Moulay Ahmed dam – Ifrane (Sidi El Makhfi and Oued Ifrane) and Khénifra (El Hammam)

Construction of irrigation and sanitation networks for the BOUHOUDA perimeter (2800 Ha) – Taounate Province

Drinking water supply to AIT OURIR center from ROCADE treatment plant – Marrakech – Lot: Pipelines

Drinking water supply to the Greater Agadir area from the Moulay Abdellah dam – Single Lot: Raw water pipeline from dam to existing loading reservoirs

Construction of pumping station and treated wastewater transfer pipeline to YOUSSOUFIA laundry facility

Air circuit / Wastewater treatment station – PRV pipelines (aboveground and underground) – BENGUERIR

Drainage system – BOUREGREG bridge

Construction of irrigation supply and distribution pipelines, including related structures – Arraja sector – Beni Moussa Ouest perimeter

Supply works for the Mhajrat/Ajras perimeter linked to Oued Martil dam

Hydro-agricultural development of DAR AKOBAA perimeter linked to Moulay Bouchta dam – Pipeline works

Chichaoua – Hydro-agricultural development of Assif Al Mal perimeter – Lot 2: Pipeline from PM 339 to PM 6048 and regulation structure (OB2)

Strengthening of the drinking water supply to the Rabat – Casablanca coastal area – Lot No. 3: Raw water pipeline

Strengthening of the drinking water supply to the Rabat – Casablanca coastal area – Lot No. 4: Treated water pipeline

Strengthening of the drinking water supply to the coastal area between Rabat and Casablanca from the Sidi Mohamed Ben Abdellah dam, Lot No. 5: Treated water pipeline between Tamesna and Oued Cherrat

Lot No. 6: Treated water pipeline between Oued Cherrat and Oued Bouznika

Lot No. 7: Treated water pipeline between Oued Bouznika and Oued Arhimène

Lot No. 8: Treated water pipeline between Oued Arhimène and the branch toward Mohammedia

Page 5 of 1030«‹34567›»

Who we are

Contact us
Career
About us
News

What we do

Footprint
Products
References
GRP

Resources for you

Brochures
Product guide
Technical documents
Videos

Join us

  • English

    Data

    Technical data

    Diameter, pressure, stiffness, and so much more… All the technical hard facts you need to plan, lay, and operate our pipelines.

    Get Info

    References

    Reference database

    Over 30,000 projects in over 125 countries in over 60 years: Discover spectacular and technically challenging construction works with Amiblu’s technologies (Flowtite, Hobas, Amiblu, Amiscreen) in our reference database.

    Start browsing

    EPDs

    Environmental Product Declarations

    Our EU-standardized EPDs provide transparent, verified and comparable information on the environmental impact of more than 1200 Amiblu products throughout their life cycle.

    Learn more

    © Amiblu Holding GmbH, 2025

    Copyright      Disclaimer      GTC      Privacy Policy

    Scroll to top