Distribution network works (Part 2) – Agricultural development – Saiss Plain – From Mdez Dam – Lot 2
Supply and installation of pipelines and irrigation hydrants – Secondary network – Tabouassite sub-sector (Upstream T2 – Tessaout Aval)
REINFORCEMENT OF EXISTING DN800 WASTEWATER COLLECTOR IN OULFA – OUM ERRBIA Boulevard – Tunneling and trenching
LOT 1: Construction of disk shutter, storage basin, and first section of distribution pipeline (PK 00 to PK 9.75)
© Amiblu Holding GmbH, 2025
