REINFORCEMENT OF EXISTING DN800 WASTEWATER COLLECTOR IN OULFA – OUM ERRBIA Boulevard – Tunneling and trenching
LOT 1: Construction of disk shutter, storage basin, and first section of distribution pipeline (PK 00 to PK 9.75)
© Amiblu Holding GmbH, 2025