Chichaoua – Hydro-agricultural development of Assif Al Mal perimeter – Lot 2: Pipeline from PM 339 to PM 6048 and regulation structure (OB2)
Strengthening of the drinking water supply to the Rabat – Casablanca coastal area – Lot No. 3: Raw water pipeline
Strengthening of the drinking water supply to the Rabat – Casablanca coastal area – Lot No. 4: Treated water pipeline
Strengthening of the drinking water supply to the coastal area between Rabat and Casablanca from the Sidi Mohamed Ben Abdellah dam, Lot No. 5: Treated water pipeline between Tamesna and Oued Cherrat
Supply and installation of pipeline and related works – Southern supply line (25 km) of the Dar Khrofa irrigated perimeter
HYDRO-AGRICULTURAL DEVELOPMENT WORKS (1st Phase) – MHAJRAT/AJRAS perimeter linked to Oued Martil dam – Tétouan Province
Hydro-agricultural development of Dar Akobaâ perimeter – Irrigation pipe network linked to Moulay Bouchta dam
MODERNIZATION PROJECT FOR IRRIGATED AGRICULTURE IN THE OUM ER RBIA BASIN – HAOUZ PERIMETER – Upstream T2 zone of Tessaout Aval perimeter
Irrigated agriculture modernization project in the Oum ERRBIA basin – Haouz perimeter, RD-S1-3 sub-sector
Bahia Golf Beach subdivision – Drinking water supply – Link pipeline between 2x3000m³ reservoir and in-site network
Tender N°40-2012 A/T – East Casablanca Anti-Pollution Project – Coastal interceptor between Mohammedia and Sidi Bernoussi and related works
© Amiblu Holding GmbH, 2025
