• Contact Us
  • English
  • Български Български Bulgarian bg
  • English English English en
  • Français Français French fr
  • Deutsch Deutsch German de
  • Polski Polski Polish pl
  • Русский Русский Russian ru
  • Español Español Spanish es
  • Čeština Čeština Czech cs
  • Dansk Dansk Danish da
  • Magyar Magyar Hungarian hu
  • Italiano Italiano Italian it
  • Nederlands Nederlands Dutch nl
  • Norsk Norsk Norwegian no
  • Svenska Svenska Swedish sv
  • Română Română Romanian ro
  • Slovenčina Slovenčina Slovak sk
  • Português Português Portuguese pt-pt
  • Ukrainian Ukrainian Ukrainian ua
Search Search
Amiblu
  • Products
    • Product Selector
    • Online Product Catalog
    • Non-pressure pipes
    • Pressure pipes
    • Jacking pipes
    • Non-circular pipes (NC Line)
    • PROX pipes
    • Joints and Couplings
    • Fittings
  • Applications
    • Reference Database
    • Wastewater
    • CSO system with solid retention
    • Potable water
    • Hydropower
    • Trenchless Applications
    • Special Pipes
    • Irrigation
    • Industry
  • Technologies
    • Centrifugal Casting (Hobas Technology)
    • Filament Winding (Flowtite Technology)
    • NC Line Technology
    • Certificates
  • Why GRP
    • Green
    • Footprint
    • Environmental responsibility of GRP
    • Economic responsibility of GRP
    • Social responsibility of GRP
    • Environmental Product Declarations
  • Company
    • About Us
    • Contact Us
    • News
    • Jobs
    • Compliance
  • Downloads
  • Menu Menu
You are here: Home1 / Technology2 / Flowtite
Lot No. 9: Treated water pipeline between Mohammedia branch and highway crossing

Supply and installation of pipeline and related works – Southern supply line (25 km) of the Dar Khrofa irrigated perimeter

HYDRO-AGRICULTURAL DEVELOPMENT WORKS (1st Phase) – MHAJRAT/AJRAS perimeter linked to Oued Martil dam – Tétouan Province

Hydro-agricultural development of Dar Akobaâ perimeter – Irrigation pipe network linked to Moulay Bouchta dam

MODERNIZATION PROJECT FOR IRRIGATED AGRICULTURE IN THE OUM ER RBIA BASIN – HAOUZ PERIMETER – Upstream T2 zone of Tessaout Aval perimeter

RAMSA AGADIR WWTP

SOTRADEMA / SAFI Project

JORF LASFAR units 5 & 6 project

Khénifra Project

Drinking water supply to the city of Kariat Ba Mohamed and surrounding rural communes

Drinking water supply to the Douars of El Jadida Province – Shema Chtouka Lot 1: Supply pipeline

Strengthening of drinking water supply to Marrakech – Lot 2-1: Supply and treated water pipeline

Irrigated agriculture modernization project in the Oum ERRBIA basin – Haouz perimeter, RD-S1-3 sub-sector

Water supply works from the Sfeissif dam to the Figuig palm grove – Province of Figuig – Phase 2

Bahia Golf Beach subdivision – Drinking water supply – Link pipeline between 2x3000m³ reservoir and in-site network

Dar Bouazza Project

Tender N°40-2012 A/T – East Casablanca Anti-Pollution Project – Coastal interceptor between Mohammedia and Sidi Bernoussi and related works

Kribaâ / Irrigation of Ras El Ain perimeter in Berkane

Hydro-agricultural development works of the new irrigated perimeter of Tafrata – Taourirt Province – Phase 1: Supply and installation of first lift pipeline section

Supply and installation of PRV pipes and manholes for WWTP connection – Meknes plant

CENTRAL MOROCCO / SROC

ODI JORF LASFAR

Hydro-agricultural development of the Ouljas – Moyen Sebou and Inaouen Aval Project (Sectors IV & V) – Moulay Yacoub Province – Phase 2: Supply pipeline section

Supply, transport, and installation of pipelines and related structures – A4 Supply & M8/M9 Distribution Networks – Annour sector

Construction of 2nd downstream section of the supply pipeline for BOUHOUDA perimeter

Development of the El GUERDANE irrigation perimeter

Strengthening of drinking water supply (AEP) for the city of Conakry

Rehabilitation of the Mzar pipeline

Sanitation of the old Medina of Marrakech

Gravity network for the reuse of treated wastewater

Page 6 of 509«‹45678›»

Who we are

Contact us
Career
About us
News

What we do

Footprint
Products
References
GRP

Resources for you

Brochures
Product guide
Technical documents
Videos

Join us

  • English

    Data

    Technical data

    Diameter, pressure, stiffness, and so much more… All the technical hard facts you need to plan, lay, and operate our pipelines.

    Get Info

    References

    Reference database

    Over 30,000 projects in over 125 countries in over 60 years: Discover spectacular and technically challenging construction works with Amiblu’s technologies (Flowtite, Hobas, Amiblu, Amiscreen) in our reference database.

    Start browsing

    EPDs

    Environmental Product Declarations

    Our EU-standardized EPDs provide transparent, verified and comparable information on the environmental impact of more than 1200 Amiblu products throughout their life cycle.

    Learn more

    © Amiblu Holding GmbH, 2025

    Copyright      Disclaimer      GTC      Privacy Policy

    Scroll to top