• Contact Us
  • English
  • Български Български Bulgarian bg
  • English English English en
  • Français Français French fr
  • Deutsch Deutsch German de
  • Polski Polski Polish pl
  • Русский Русский Russian ru
  • Español Español Spanish es
  • Čeština Čeština Czech cs
  • Dansk Dansk Danish da
  • Magyar Magyar Hungarian hu
  • Italiano Italiano Italian it
  • Nederlands Nederlands Dutch nl
  • Norsk Norsk Norwegian no
  • Svenska Svenska Swedish sv
  • Română Română Romanian ro
  • Slovenčina Slovenčina Slovak sk
  • Português Português Portuguese pt-pt
Search Search
Amiblu
  • Products
    • Product Selector
    • Online Product Catalog
    • Non-pressure pipes
    • Pressure pipes
    • Jacking pipes
    • Non-circular pipes (NC Line)
    • PROX pipes
    • Joints and Couplings
    • Fittings
  • Applications
    • Reference Database
    • Wastewater
    • CSO system with solid retention
    • Potable water
    • Hydropower
    • Trenchless Applications
    • Special Pipes
    • Irrigation
    • Industry
  • Technologies
    • Centrifugal Casting (Hobas Technology)
    • Filament Winding (Flowtite Technology)
    • NC Line Technology
    • Certificates
  • Why GRP
    • Green
    • Footprint
    • Environmental responsibility of GRP
    • Economic responsibility of GRP
    • Social responsibility of GRP
    • Environmental Product Declarations
  • Company
    • About Us
    • Contact Us
    • News
    • Jobs
    • Compliance
  • Downloads
  • Menu Menu
You are here: Home1 / Installation
Dunav Blvd, Brezovsko shousse

Regional pre-investment study (RPIP), Sliven

Regional pre-investment study (RPIP), Kazanluk

Regional pre-investment study (RPIP), Chirpan

Regional pre-investment study (RPIP), South, Stara Zagora

Southern Collector

Lomsko shousse Blvd

Pholip Kutev Str.

Amiscreen Staukanal Triftgraben

Amiscreen Staukanal Bermbach

Amiscreen Staukanal Diedorf

Amiscreen Staukanal Einhausen

Amiscreen Staukanal Etterwinden Moorgrund

Amiscreen Staukanal Fischbach

Amiscreen Staukanal Riedbrunnen BA II

Amiscreen Staukanal Schelmenwiese

Amiscreen Staukanal Geisa OT Bremen 310 m³

Amiscreen Staukanal Geismar

Flowtite Grey pipes for safe and sustainable water supply in Bouaké, Ivory Coast
GRP ensures safe and sustainable water supply in Ivory Coast

Lauvstad kraftverk

Skjeggfoss kraftverk

Fossåa kraftverk

Øvre Alsaker

Stølen kraftverk

Sandalselva kraftverk

Ørsdalen kraftverk

Måråe kraftverk

Breivikelva kraftverk

Tindåga kraftverk

Drøllstølsbekken kraftverk

Page 43 of 799«‹4142434445›»

Who we are

Contact us
Career
About us
News

What we do

Footprint
Products
References
GRP

Resources for you

Brochures
Product guide
Technical documents
Videos

Join us

  • English

    Data

    Technical data

    Diameter, pressure, stiffness, and so much more… All the technical hard facts you need to plan, lay, and operate our pipelines.

    Get Info

    References

    Reference database

    Over 30,000 projects in over 125 countries in over 60 years: Discover spectacular and technically challenging construction works with Amiblu’s technologies (Flowtite, Hobas, Amiblu, Amiscreen) in our reference database.

    Start browsing

    EPDs

    Environmental Product Declarations

    Our EU-standardized EPDs provide transparent, verified and comparable information on the environmental impact of more than 1200 Amiblu products throughout their life cycle.

    Learn more

    © Amiblu Holding GmbH, 2025

    Copyright      Disclaimer      GTC      Privacy Policy

    Scroll to top