• Contact Us
  • English
  • Български Български Bulgarian bg
  • English English English en
  • Français Français French fr
  • Deutsch Deutsch German de
  • Polski Polski Polish pl
  • Русский Русский Russian ru
  • Español Español Spanish es
  • Čeština Čeština Czech cs
  • Dansk Dansk Danish da
  • Magyar Magyar Hungarian hu
  • Italiano Italiano Italian it
  • Nederlands Nederlands Dutch nl
  • Norsk Norsk Norwegian no
  • Svenska Svenska Swedish sv
  • Română Română Romanian ro
  • Slovenčina Slovenčina Slovak sk
  • Português Português Portuguese pt-pt
  • Ukrainian Ukrainian Ukrainian ua
Search Search
Amiblu
  • Products
    • Product Selector
    • Online Product Catalog
    • Non-pressure pipes
    • Pressure pipes
    • Jacking pipes
    • Non-circular pipes (NC Line)
    • PROX pipes
    • Joints and Couplings
    • Fittings
  • Applications
    • Reference Database
    • Wastewater
    • CSO system with solid retention
    • Potable water
    • Hydropower
    • Trenchless Applications
    • Special Pipes
    • Irrigation
    • Industry
  • Technologies
    • Centrifugal Casting (Hobas Technology)
    • Filament Winding (Flowtite Technology)
    • NC Line Technology
    • Certificates
  • Why GRP
    • Green
    • Footprint
    • Environmental responsibility of GRP
    • Economic responsibility of GRP
    • Social responsibility of GRP
    • Environmental Product Declarations
  • Company
    • About Us
    • Contact Us
    • News
    • Jobs
    • Compliance
  • Downloads
  • Menu Menu
You are here: Home1 / Pipelines2 / Irrigation
Infraestructura 12 - 2ª Fase Ferreira do Alentejo

Mejora de la Rambla y Canal del Saltador de Almería

Z.R. Tarragón TM Chulilla (Valencia)

5 zona margen izquierdo del Muga (Gerona)

Estación de Bombeo Vegas del Almar (Salamanca)

Modernización del 5 de las Vegas del Almar (Salamanca)

Red de Riego en el Canal Lagoa de Antela

5 Sector XI Canal del Cinca en Berbegal, Laluenga

Riegos Ilche-Monzón: Desagüe de XII-V y el Ferrocarril

Z.R. Tarragón TM Chulilla (Valencia)

Vega Baja del Segura

Transformación de Regadío en Moncófar

Transformación de regadío C.R. Rio de Alcoy Fase 2 en La Safor (Valencia)

Riegos Ilche-Monzón: Desagüe de XII-V y el Ferrocarril

Riego en Alginet

Regadío zona margen izquierdo del Muga (Gerona)

Regadío Sector XI Canal del Cinca en Berbegal, Laluenga

Red de Riego en el Canal Lagoa de Antela

Modernización del regadío de las Vegas del Almar (Salamanca)

Mejora de la Rambla y Canal del Saltador de Almería

Infraestructura 12 - 2ª Fase Ferreira do Alentejo

Bozova pumping Irrigation Project

Bitlis Ahlat Irrigation

Armağan Çukurpınar Irrigation (Kırklareli)

Van Erciş Koçköprü Irrigation Project

Sivas Divriği Irrigation

Kocaeli Kandıra Arıklar Pond Irrigation

Mujib Irrigation Project

Upper Harran Plain Irrigation Project

Al Moah Palmyra Water Supply project

Page 25 of 29«‹2324252627›»

Who we are

Contact us
Career
About us
News

What we do

Footprint
Products
References
GRP

Resources for you

Brochures
Product guide
Technical documents
Videos

Join us

  • English

    Data

    Technical data

    Diameter, pressure, stiffness, and so much more… All the technical hard facts you need to plan, lay, and operate our pipelines.

    Get Info

    References

    Reference database

    Over 30,000 projects in over 125 countries in over 60 years: Discover spectacular and technically challenging construction works with Amiblu’s technologies (Flowtite, Hobas, Amiblu, Amiscreen) in our reference database.

    Start browsing

    EPDs

    Environmental Product Declarations

    Our EU-standardized EPDs provide transparent, verified and comparable information on the environmental impact of more than 1200 Amiblu products throughout their life cycle.

    Learn more

    © Amiblu Holding GmbH, 2025

    Copyright      Disclaimer      GTC      Privacy Policy

    Scroll to top