• Contact Us
  • English
  • Български Български Bulgarian bg
  • English English English en
  • Français Français French fr
  • Deutsch Deutsch German de
  • Polski Polski Polish pl
  • Русский Русский Russian ru
  • Español Español Spanish es
  • Čeština Čeština Czech cs
  • Dansk Dansk Danish da
  • Magyar Magyar Hungarian hu
  • Italiano Italiano Italian it
  • Nederlands Nederlands Dutch nl
  • Norsk Norsk Norwegian no
  • Svenska Svenska Swedish sv
  • Română Română Romanian ro
  • Slovenčina Slovenčina Slovak sk
  • Português Português Portuguese pt-pt
Search Search
Amiblu
  • Products
    • Product Selector
    • Online Product Catalog
    • Non-pressure pipes
    • Pressure pipes
    • Jacking pipes
    • Non-circular pipes (NC Line)
    • PROX pipes
    • Joints and Couplings
    • Fittings
  • Applications
    • Reference Database
    • Wastewater
    • CSO system with solid retention
    • Potable water
    • Hydropower
    • Trenchless Applications
    • Special Pipes
    • Irrigation
    • Industry
  • Technologies
    • Centrifugal Casting (Hobas Technology)
    • Filament Winding (Flowtite Technology)
    • NC Line Technology
    • Certificates
  • Why GRP
    • Green
    • Footprint
    • Environmental responsibility of GRP
    • Economic responsibility of GRP
    • Social responsibility of GRP
    • Environmental Product Declarations
  • Company
    • About Us
    • Contact Us
    • News
    • Jobs
    • Compliance
  • Downloads
  • Menu Menu
You are here: Home1 / Installation2 / Open Trench
Gorinchem

Kakabeek rev 2

Collector Broebelaar

Duivelsgatbrug

Culvert

Pressure pipe system Westduinstraat

Groningen Seaports - protective pipes railway crossing

Wastewater Treatment Plant - Beveren - Leie

Wastewater Treatment Plant - Beveren - Leie

Community Berkel & Roderijs

Community Bergen op Zoom

Melkweg fase 2 Insigne

Aanleg 48 Gas transport pipelines

Shumen Sewerage

Velingrad HPP Dolene

Burgas, Sewerage

Kozlodui, Sewerage

Tsarevo, Sewerage

Gorni Lom MHPP ERT 3 Pressure Line

Stara Zagora, Koljo Ganchevo Distr. Sewerage

Plovdiv Krumovo Main Road Passing

Karlovo HPP Levski Pressure Part

Plovdiv Krumovo Sewage RR

Dolna Bania Golf Club Ibar

Stara Zagora Main Collector 1

Taja HPP Taja Dalboka Reka

Plovdiv bul. Bulgaria and North Collector

Silistra, Ajdimir, Sewerage

Varna, Reconstruction of main water line for potable water

Razgrad, Sewerage

Page 222 of 697«‹220221222223224›»

Who we are

Contact us
Career
About us
News

What we do

Footprint
Products
References
GRP

Resources for you

Brochures
Product guide
Technical documents
Videos

Join us

  • English

    Data

    Technical data

    Diameter, pressure, stiffness, and so much more… All the technical hard facts you need to plan, lay, and operate our pipelines.

    Get Info

    References

    Reference database

    Over 30,000 projects in over 125 countries in over 60 years: Discover spectacular and technically challenging construction works with Amiblu’s technologies (Flowtite, Hobas, Amiblu, Amiscreen) in our reference database.

    Start browsing

    EPDs

    Environmental Product Declarations

    Our EU-standardized EPDs provide transparent, verified and comparable information on the environmental impact of more than 1200 Amiblu products throughout their life cycle.

    Learn more

    © Amiblu Holding GmbH, 2025

    Copyright      Disclaimer      GTC      Privacy Policy

    Scroll to top