• Contact Us
  • English
  • Български Български Bulgarian bg
  • English English English en
  • Français Français French fr
  • Deutsch Deutsch German de
  • Polski Polski Polish pl
  • Русский Русский Russian ru
  • Español Español Spanish es
  • Čeština Čeština Czech cs
  • Dansk Dansk Danish da
  • Magyar Magyar Hungarian hu
  • Italiano Italiano Italian it
  • Nederlands Nederlands Dutch nl
  • Norsk Norsk Norwegian no
  • Svenska Svenska Swedish sv
  • Română Română Romanian ro
  • Slovenčina Slovenčina Slovak sk
  • Português Português Portuguese pt-pt
Search Search
Amiblu
  • Products
    • Product Selector
    • Online Product Catalog
    • Non-pressure pipes
    • Pressure pipes
    • Jacking pipes
    • Non-circular pipes (NC Line)
    • PROX pipes
    • Joints and Couplings
    • Fittings
  • Applications
    • Reference Database
    • Wastewater
    • CSO system with solid retention
    • Potable water
    • Hydropower
    • Trenchless Applications
    • Special Pipes
    • Irrigation
    • Industry
  • Technologies
    • Centrifugal Casting (Hobas Technology)
    • Filament Winding (Flowtite Technology)
    • NC Line Technology
    • Certificates
  • Why GRP
    • Green
    • Footprint
    • Environmental responsibility of GRP
    • Economic responsibility of GRP
    • Social responsibility of GRP
    • Environmental Product Declarations
  • Company
    • About Us
    • Contact Us
    • News
    • Jobs
    • Compliance
  • Downloads
  • Menu Menu
You are here: Home1 / Installation2 / Above Ground
Grajewo - footbridge

A4 Zgorzelec Wykroty

A4 Krzyzowa Wykroty

Usvit, bridgeline

Bratislava, STRABAG center, sewerline

Mengusovce Janovce, bridgedrainage

Szekszard, M6 highway

Kardzhali River Arda Passing

Tunnel pipeline Tunnels de l’Arzillier

Tunnel pipeline N16 Transjurane (Tunnel de Moutier)

Tunnel pipeline La Tour-de-Trême - Bulle

Tunnel pipeline La Tour-de-Trême - Bulle

Tunnel pipeline La Tour-de-Trême - Bulle

Pressure pipe for hydroelectric power plants Ponte Brolla
Pressure pipe for hydroelectric power plants Ponte Brolla

Motorway Bridge Drainage at A4 Sośnica
Motorway Bridge Drainage at A4 Sośnica – Gorzyczki with more than 1000 Pipeline Fittings

Hydropower Station in Norway Received a Durable HOBAS Penstock
Hydropower Station in Norway Received a Durable HOBAS Penstock

Wasteater Pipline to WWTP for a Blue Danube
Wasteater Pipline to WWTP for a Blue Danube

Green Hydropower Pipeline for Green Energy in Swiss Tessin
Green Hydropower Pipeline for Green Energy in Swiss Tessin

Direct Polluted Rawa Water to Treatment Plant
Direct Polluted Rawa Water to Treatment Plant

Zoltki - bridge across Narew

Wroclaw, Czekoladowa II - viaduct

Wisniewo - bridge across Dab river

Sosnowiec - viaduct drainage

Skoczow - bridge drainage

Rajgrod DK 61 - bridge

Pulawy - Birdge across Vistula river

Poleczki WD 30

Plonsk - bypass

Nowy Korczyn DK 79

Krakow - viaduct Rondo

Page 17 of 28«‹1516171819›»

Who we are

Contact us
Career
About us
News

What we do

Footprint
Products
References
GRP

Resources for you

Brochures
Product guide
Technical documents
Videos

Join us

  • English

    Data

    Technical data

    Diameter, pressure, stiffness, and so much more… All the technical hard facts you need to plan, lay, and operate our pipelines.

    Get Info

    References

    Reference database

    Over 30,000 projects in over 125 countries in over 60 years: Discover spectacular and technically challenging construction works with Amiblu’s technologies (Flowtite, Hobas, Amiblu, Amiscreen) in our reference database.

    Start browsing

    EPDs

    Environmental Product Declarations

    Our EU-standardized EPDs provide transparent, verified and comparable information on the environmental impact of more than 1200 Amiblu products throughout their life cycle.

    Learn more

    © Amiblu Holding GmbH, 2025

    Copyright      Disclaimer      GTC      Privacy Policy

    Scroll to top