• Contact Us
  • English
  • Български Български Bulgarian bg
  • English English English en
  • Français Français French fr
  • Deutsch Deutsch German de
  • Polski Polski Polish pl
  • Русский Русский Russian ru
  • Español Español Spanish es
  • Čeština Čeština Czech cs
  • Dansk Dansk Danish da
  • Magyar Magyar Hungarian hu
  • Italiano Italiano Italian it
  • Nederlands Nederlands Dutch nl
  • Norsk Norsk Norwegian no
  • Svenska Svenska Swedish sv
  • Română Română Romanian ro
  • Slovenčina Slovenčina Slovak sk
  • Português Português Portuguese pt-pt
Search Search
Amiblu
  • Products
    • Product Selector
    • Online Product Catalog
    • Non-pressure pipes
    • Pressure pipes
    • Jacking pipes
    • Non-circular pipes (NC Line)
    • PROX pipes
    • Joints and Couplings
    • Fittings
  • Applications
    • Reference Database
    • Wastewater
    • CSO system with solid retention
    • Potable water
    • Hydropower
    • Trenchless Applications
    • Special Pipes
    • Irrigation
    • Industry
  • Technologies
    • Centrifugal Casting (Hobas Technology)
    • Filament Winding (Flowtite Technology)
    • NC Line Technology
    • Certificates
  • Why GRP
    • Green
    • Footprint
    • Environmental responsibility of GRP
    • Economic responsibility of GRP
    • Social responsibility of GRP
    • Environmental Product Declarations
  • Company
    • About Us
    • Contact Us
    • News
    • Jobs
    • Compliance
  • Downloads
  • Menu Menu
You are here: Home1 / Installation2 / Above Ground
Ostroda road S7

Poznan University Bridge Roundaboat Kaponiera

Gorzow Wielkopolski S3 by-pass

Poznan Krolowej Jadwigi

Milomlyn Ostroda S7

Ploče, bridge Vranjak

Osijek, Josipovac

Našice

Mostovi Kaštel Stari - Kaštel Sucurac

Dugo Selo-Križevci, railway reconstruction

Bridge Krapina i Grgici

Letaj, Mini Hydro Power Plant

Bridge drainage Kerntangente Nord

Highway E80, Prosek-Bancarevo

Bridge sewer AC Gruškovje

Laktaši 2 bridge

Mahovljani bridge

Tešanj and Doboj

AC Banja Luka - Prnjavor

Vrbas bridge

Bridge pipeline in Crespellano (Bologna)

Bridge pipeline in Brunico (Bolzano)

Bridge pipeline in Orsago (Treviso)

Bridge pipeline in San Benigno (Genova)

Bridge pipeline in Porto S. Elpidio (Fermo)

Bridge pipeline in Renon (Bolzano)

Bridge pipeline in Pian el Voglio (Bologna)

Poznan University Bridge, Kaponiera rondo

Bydgoszcz, Bydgoszcz Channel, bridge

Reinforcement and securing the domestic wastewater pumping in Pierrelaye (95). Sewer works in technical gallery. Discharge network.

Page 6 of 28«‹45678›»

Who we are

Contact us
Career
About us
News

What we do

Footprint
Products
References
GRP

Resources for you

Brochures
Product guide
Technical documents
Videos

Join us

  • English

    Data

    Technical data

    Diameter, pressure, stiffness, and so much more… All the technical hard facts you need to plan, lay, and operate our pipelines.

    Get Info

    References

    Reference database

    Over 30,000 projects in over 125 countries in over 60 years: Discover spectacular and technically challenging construction works with Amiblu’s technologies (Flowtite, Hobas, Amiblu, Amiscreen) in our reference database.

    Start browsing

    EPDs

    Environmental Product Declarations

    Our EU-standardized EPDs provide transparent, verified and comparable information on the environmental impact of more than 1200 Amiblu products throughout their life cycle.

    Learn more

    © Amiblu Holding GmbH, 2025

    Copyright      Disclaimer      GTC      Privacy Policy

    Scroll to top