• Contact Us
  • English
  • Български Български Bulgarian bg
  • English English English en
  • Français Français French fr
  • Deutsch Deutsch German de
  • Polski Polski Polish pl
  • Русский Русский Russian ru
  • Español Español Spanish es
  • Čeština Čeština Czech cs
  • Dansk Dansk Danish da
  • Magyar Magyar Hungarian hu
  • Italiano Italiano Italian it
  • Nederlands Nederlands Dutch nl
  • Norsk Norsk Norwegian no
  • Svenska Svenska Swedish sv
  • Română Română Romanian ro
  • Slovenčina Slovenčina Slovak sk
  • Português Português Portuguese pt-pt
Search Search
Amiblu
  • Products
    • Product Selector
    • Online Product Catalog
    • Non-pressure pipes
    • Pressure pipes
    • Jacking pipes
    • Non-circular pipes (NC Line)
    • PROX pipes
    • Joints and Couplings
    • Fittings
  • Applications
    • Reference Database
    • Wastewater
    • CSO system with solid retention
    • Potable water
    • Hydropower
    • Trenchless Applications
    • Special Pipes
    • Irrigation
    • Industry
  • Technologies
    • Centrifugal Casting (Hobas Technology)
    • Filament Winding (Flowtite Technology)
    • NC Line Technology
    • Certificates
  • Why GRP
    • Green
    • Footprint
    • Environmental responsibility of GRP
    • Economic responsibility of GRP
    • Social responsibility of GRP
    • Environmental Product Declarations
  • Company
    • About Us
    • Contact Us
    • News
    • Jobs
    • Compliance
  • Downloads
  • Menu Menu
You are here: Home1 / Technology2 / Hobas
Abwasserleitung Heidenreichstein

First-HOBAS-Hydropower-Pipeline-1961-Wallis-Switzerland
Switzerland‘s First GRP Hydropower Pipeline in 1961

Area of subsidence Bergkamen (Heinrichstraße)

Tunnel pipeline Stallikon (Uetlibergtunnel)

Tunnel pipeline N16 Transjurane (Tunnel du Mont-Terri)

Tunnel pipeline N16 Transjurane (Tunnel du Mont-Russelin)

Tunnel pipeline Tunnel Les Vignes

Tunnel pipeline Murten

Tunnel pipeline St. Maurice

Tunnel pipeline Tranchée couverte de Chèvre

Tunnel pipeline - RN 1A

Tunnel pipeline Raimeux Roches

Tunnel pipeline Mattstetten-Rothrist (Eisenbahnstrecke)

Tunnel pipeline Les Granges - Bulle

Tunnel pipeline La Tour-de-Trême - Bulle

Wastewater treatment plant Erfurt-Kühnhausen

Single and double pipelines in potable water protected areas Düsseldorf

Sewage pressure pipeline Neubrandenburg

Bridge Drainage with Hobas Pipes on Croatian Highway in Osijek
Bridge Drainage with Hobas Pipes on Croatian Highway in Osijek

3 Meter Diameter Wastewater Pipeline
3 Meter Diameter Wastewater Pipeline Jacked under Warsaw

Pressure-Pipes-for-Power-Plant-Berguen-Filisur-1965
HOBAS Pressure Pipes Ensure Filisur Power Plant Operation for more than 50 years

Hobas Sewer Pipes
Totally Satisfied for Over 35 Years - Hobas Sewer Pipes Impress Testing Company

Page 577 of 577«‹575576577

Who we are

Contact us
Career
About us
News

What we do

Footprint
Products
References
GRP

Resources for you

Brochures
Product guide
Technical documents
Videos

Join us

  • English

    Data

    Technical data

    Diameter, pressure, stiffness, and so much more… All the technical hard facts you need to plan, lay, and operate our pipelines.

    Get Info

    References

    Reference database

    Over 30,000 projects in over 125 countries in over 60 years: Discover spectacular and technically challenging construction works with Amiblu’s technologies (Flowtite, Hobas, Amiblu, Amiscreen) in our reference database.

    Start browsing

    EPDs

    Environmental Product Declarations

    Our EU-standardized EPDs provide transparent, verified and comparable information on the environmental impact of more than 1200 Amiblu products throughout their life cycle.

    Learn more

    © Amiblu Holding GmbH, 2025

    Copyright      Disclaimer      GTC      Privacy Policy

    Scroll to top